Interstate 985

Interstate 985
Sidney Lanier Parkway
Route information
Maintained by GADOT
Length: 24.04 mi[1] (38.69 km)
Existed: mid 1960's (roadway), 1985 (as I-985) – present
Major junctions
South end: I-85 / SR 365 near Buford
North end:
US 23 / US 129 Bus. / SR 365 / SR 369 in Gainsville
Highway system

Auxiliary route of the Interstate Highway System
Main • Auxiliary • Business

Georgia State Routes
Former SR

SR 417 SR 419 SR 421

Interstate 985 (I-985) is a 24.04-mile (38.69 km) long auxiliary Interstate Highway in Georgia. It begins at Interstate 85 near Suwanee and continues northward to the north Georgia city of Gainesville. I-985 is also known as the Sidney Lanier Parkway and is the unsigned State Route 419.

I-985 and SR 365 currently run concurrently — both routes end at the interchange with I-85 near Suwanee — but only the I-985 signs are displayed. I-985 also overlaps U.S. Route 23 from exit 4 northward; US 23 was moved onto the Interstate once it was completed.

I-985 is the highest-numbered spur route of a north-south Interstate, and is second only to Interstate 990, which serves the Buffalo metropolitan area.

Contents

Route description

I-985 heads northeast from the southern terminus at I–85, towards Gainsville. Southeastern of Gainsville I–985 has an interchange with U.S. Route 129. Then I–985 has an interchange with State Route 369, this interchange is also the northern terminus of I–985. [2]

The speed limit is 70 mph (113km/h) except north of exit 22 where the speed limit drops to 65 mph (105 km/h). After exit 24, I-985 ends, and the freeway becomes a four-lane highway with at-grade intersections.

History

The highway was built in the mid 1960s as State Route 365; it was given the I-985 designation in 1985.

Exit list

County Location Mile Exit Destinations Notes
Gwinnett
  I-85 south – Atlanta Southbound exit and northbound entrance
Buford 4 US 23 south / SR 20 – Cumming, Buford South end of US 23 overlap
Hall
  8 SR 347 (Friendship Road) – Lake Lanier
Flowery Branch 12 Spout Springs Road – Flowery Branch Rankin Smith interchange
Oakwood 16 SR 53 – Oakwood, Dawsonville Northbound exit ramp to SR 53 only; no southbound exit 16
17 SR 13 – Gainesville Northbound exit ramp to SR 13 only: southbound exit includes separate ramps to SR 13 and SR 53
Gainesville 20 SR 60 / SR 53 Conn. (Candler Road) – Gainesville, Dawsonville
22
US 129 south / US 129 Bus. north (SR 11) – Gainesville, Jefferson
South end of US 129 overlap
24 US 129 north / SR 369 west – Gainesville, Cleveland, Cumming North end of US 129 overlap
US 23 north / SR 365 north Continuation beyond US 129
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
     Concurrency terminus     Closed/Former     Incomplete access     Unopened

References

External links